Hanoi city is planning to construct the Belt Road 5 before 2027. The road is over 300km long, with a 48km section passing through Hanoi city and designed with a 6-lane expressway.
A report on the 15-year implementation of Resolution 15 by the National Assembly on expanding the administrative boundaries of Hanoi city reveals that the city is currently accelerating the progress of the master plan for the capital city from 2021 to 2030, with a vision towards 2050.
Accordingly, the city aims to make significant breakthroughs in infrastructure, especially in the belt road system, radial axes, and road bridges. They plan to complete several crucial transportation projects urgently within their territory.
Specifically, Hanoi is striving to complete Belt Road 4 before 2027 and sets a target to construct Belt Road 5 before 2027. In the coming time, they will expedite the progress of elevated transportation projects and urban railways.
Hanoi aims to soon complete the belt roads and radial traffic axes.
Related
Source: Vietnam Insider